As you can see from the attached photo, windows are being installed at the Fairbank building. I mentioned in an earlier post that the exterior brick would be continued later this spring, but you'll notice as you drive by that the building has some enclosures on the south end. At this point, the masons plan to continue with the external brick around the building, so you'll start seeing more progress on the exterior of the building once again. The roof structure--steel joists and decking--in Fairbank is nearly complete. The next step will be to cover the steel decking with two sheets of insulation and a rubber membrane. You should start seeing roofers working on that part of the project as well. Inside the building, there is continued progress being made to frame the classrooms with steel studs; as that work progresses, I'll show some pictures of the classrooms, offices, and workrooms taking shape.