Framing with Steel Studs in Readlyn

As the building becomes more and more enclosed in Readlyn, it gets harder and harder to see the progress that is being made inside the building. Inside, the steel studs that will frame the office and classroom areas are being installed. In the picture attached to this post, you can see the studs that will will later be covered with sheet rock. On the left side of the photo, you can also see a doorway that will soon be framed in with block. Work continues on the roof in Readlyn as well. When you drive by the site, you'll notice huge bundels on the roof; these bundels are sheets of insulation that are placed down over the steel roof, and then covered with a rubber membrane.