Wednesday, October 21, 2009

Floors Poured in Fairbank

We've mentioned over the past few posts that the interior and exterior walls are taking shape in Fairbank. This week, we're seeing the "slab on grade," or the cement floors going in on the northwest "wing" of the school building. As you can see on the video, much of the floor in this part of the building is poured, and you can see that another sizeable portion is prepared to be poured. Eventually, the cement will be covered with a variety of floor coverings, including terazzo in the corridors, and carpet tiles in many of the classrooms.

No comments:

Post a Comment